Terraced House | Halsey Street SW3

Project Features

  • Grade II Listed Refurbishment
  • New infrastructure with Air Conditioning and Lutron Lighting automation system
  • Book match marble bathrooms

Client

Private Client

Project Value

£1m+

Contract Period

52 Weeks

Architect

Powell Tuck

Interior Designer

Powell Tuck

Structures

Train & Kemp

PQS/PM

Stockdale

Located in the heart of London, the owners of this privately-owned, Grade II listed family home came to Chelsea Construction Company with some very specific goals; to introduce more light by rebuilding the rear façade, allowing for much larger windows, and to increase the available space through the construction of roof dormers in the attic as well structural work to the lower ground level.

The history and location of the building made the whole project significantly more complicated:

  • The construction of a rear façade demanded temporary works to support the property
  • Underfloor heating needed careful design and build up to maximise the heat output
  • Air-conditioning was installed without impacting on the design or heritage of the house

Get In Touch

Chelsea Construction Company
12 Celbridge Mews
London
W2 6EU

+44 (0) 207 706 9995